-
14:00
Cost model for Higgs factory based on circular collider
-
Dou WANG
(IHEP)
-
14:25
Plasma injection progress for CEPC
-
Dazhang LI
(IHEP)
-
14:50
Recent investigations for the beam-beam instability
-
林椿涛
-
15:35
Error budget analysis to the acceptable DA of the collider ring
-
Bin Wang
(IHEP)
-
16:00
The first results of the Electrostatic-Magnetic deflector
-
bin 陈斌
(高能所)
-
16:25
The status of dipole prototypes for the booster
-
Wen 康文
(Accelerator Centor, IHEP)
-
16:50
CEPC Synchrotron Radiation Shielding Design Update
-
Guangyi Tang
(IHEP)