-
14:00
Introduction of C3-Cool Copper Collider Higgs Factory to Multi-TeV and Key Technology Development
-
Jie GAO
(IHEP)
-
14:25
Preliminary study for SPPC 125 TeV Scheme
-
靖宇 Tang
(IHEP, CAS)
-
14:50
Status of CEPC accelerator system electronic documentation (ProjectWise) and coordinated design
-
Song Jin
(IHEP,CAS)
-
15:15
Review and introduction of the CEPC accelerator electronic documentation and coordinated design system new development
-
lei ye
(powerchina huadong engineering corporation limited)
-
15:55
Parameter Study & Optimization for the Final Focus Quardrupole
-
Yiwei WANG
(IHEP)
-
16:05
SCU Status Report based on snake shape coils
-
YANG Xiangchen
(高能所)
-
16:30
SCU Status Report based on CCT scheme
-
Qingjin XU
(高能所)
-
16:55
Recent progress on the Cost Model for Higgs factory based on circular collider
-
Dou WANG
(IHEP)