J-PARC Linac and RCS operational status and upgrade plan to 2 MW

Not scheduled
20m
V7, the 4th floor

V7, the 4th floor

Oral presentation Accelerator

Speaker

Kazami Yamamoto (Japan Atomic Energy Agency)

Description

The 3-GeV rapid cycling synchrotron at the Japan Pro-ton Accelerator Research Complex was designed to pro-vide 1-MW proton beams to the following facilities. Thanks to the improvement works of the accelerator sys-tem, we successfully accelerate 1-MW beam with quite small beam loss. Currently, the beam power of RCS is limited by the lack of anode current in the RF cavity system rather than the beam loss. Recently we developed a new acceleration cavity that can accelerate a beam with less anode current. This new cavity enables us not only to reduce requirement of the anode power supply but also to accelerate more than 1-MW beam. We have started to consider the way to achieve beyond 1-MW beam acceler-ation. So far, it is expected that up to 1.5-MW beam can be accelerated after replacement of the RF cavity. We have also continued study to achieve more than 2 MW beam in J-PARC RCS.

Primary author

Kazami Yamamoto (Japan Atomic Energy Agency)