-
14:00
The plans of the superconducting RF cavity R&D for the CEPC EDR
-
鹏 沙
(高能所)
-
14:25
CEPC control system development in EDR
-
Dapeng JIN
(Institute of High Energy Physics, CAS, China)
-
14:50
CEPC Mechanical system and Mockup tunnel in EDR
-
海静 王
(高能所)
-
15:30
Beam background simulations for the CEPC and the experience from BEPCII
-
Bin Wang
(IHEP)
-
15:55
Feasibility study of the automatic fabrication line for the booster dipole
-
文 康
(Accelerator Centor, IHEP)
-
16:20
The status of BPM electronics R&D and its application considerations
-
Yanfeng Sui
(高能所)
-
16:45
Collimation simulations for the machine protection and a tentative scheme for the longitudinal polarization
-
Yuting Wang
(IHEP)