-
09:00
CEPC civil engineering design progresses
-
hongying zou
(黄河勘测规划设计研究院有限公司)
豫 肖
(黄河勘测规划设计研究院有限公司)
-
09:20
CEPC injection and extraction system edr progresses (including the kickers replacing electro-magnetic seperators)
-
Jinhui Chen
(Institute of High Energy Physics)
-
09:40
cepc collider ring quadupole and sextupole mechanical design progress
-
梅 杨
-
10:00
Equipment layout in the auxiliary tunnel (with cable number and cable type and dimension information to the tunnel)
-
UNKNOWN 黄金书
-
10:35
CEPC 650Mhz cryomodule design and transverse dimention control
-
Jiyuan Zhai
(IHEP)
-
10:55
CEPC collimator number optimization (reduction) at different energies
-
小昊 崔
(Accelerator Center)
-
11:15
CEPC luminosity limitations coming from impedances
-
Na WANG
(高能所)
-
11:40
CEPC SC cryostate design and IR region beam pipes
-
啸辰 杨
(高能所)
张祥镇 ZHANG Xiangzhen
(高能所)