-
2:00 PM
Long range alignment tolerences and the BPM requirements of the CEPC collider ring
-
Bin Wang
(IHEP)
-
2:25 PM
CEPC bypass lattice for energy switches in collider ring
-
Yiwei WANG
(IHEP)
-
2:50 PM
CEPC tunnel radiation level studies with vacuum chamber equipped with photo absorber
-
Guangyi Tang
(IHEP)
-
3:45 PM
CEPC vacuum chamber production line, and discussion on vacuum chamber with photon absober
-
Yongsheng MA
(高能所)
-
4:10 PM
CEPC polarization study progress status
-
Zhe DUAN
(高能所)
-
4:35 PM
Possibility studies of 3T magetic detector field for CEPC Z pole operation
-
Yiwei WANG
(IHEP)