-
09:00
Verficicaytion of the TDR vacuum chamber shielding design in comparison with antichamber vaccum system with photon absorter
-
Guangyi Tang
(IHEP)
-
09:20
Justification of the combined dipole and sextupole magnet design of booster (condisering aligment) and the dipole magnet EDR progress (to be reviewed in beginning of 2025)
-
Dou WANG
(IHEP)
Xiaolong Wang
(高能所)
文 康
(Accelerator Centor, IHEP)
-
09:40
CEPC CCT type SC quandrupole design status (to be reviewed in beginning of 2025)
-
UNKNOWN 朱应顺
(高能所)
-
10:00
CEPC SC quadrupole cryostate design status
-
啸辰 杨
(高能所)
-
10:50
CEPC cryogenic system EDR design status (to be reviewed in beginning of 2025 )
-
Rui 葛锐
(IHEP)
梅 李
-
11:10
CEPC transferline EDR design with all the injector/extraction kickers
-
小昊 崔
(Accelerator Center)
-
11:30
CEPC C-band test facility plan
-
敬如 张
(高能所)