2:00 PM
CEPC sc cryostate mechnical deformation, alignment and installation studies
-
Xiaolong Wang
(高能所)
海静 王
(高能所)
-
2:25 PM
CEPC all transport lines' survey design
-
小昊 崔
(Accelerator Center)
-
2:50 PM
CEPC vacuum chamber design with photon absorbers in comparison with TDR vacuum design
-
Yongsheng MA
(高能所)
Guangyi Tang
(IHEP)
Na WANG
(高能所)
梅 杨
-
3:15 PM
CEPC installation procedure detail studies and massive quantity equipment storage warehoure numbers, surfaces and location optimization study
-
Xiaolong Wang
(高能所)
-
4:10 PM
CEPC edr mechanical detailed layout design progress (linac,transportline,booster,collider ring,MDI, etc)
-
海静 王
(高能所)
-
4:35 PM
CEPC auxiliary tunnel equipment arrangement and all cables from the power sources quipments to the tunnel
-
Fuqing Chen
黄金书
-
5:00 PM
CEPC collider IP region antis-olenoide and lattice optimization for Z pole 3T operation
-
Yiwei WANG
(IHEP)