-
9:00 AM
CEPC geological survey and civil engineering design progress status
-
Jianfeng Liu
-
9:20 AM
Dipole magnet solution study for antechamber and photon absorber scheme
-
梅 杨
Yongsheng MA
(高能所)
Guangyi Tang
(IHEP)
-
9:40 AM
CEPC main tunnel and auxiliary tunnel cabling and cooling water connection schemes up to components (booster and collider magnets)
-
UNKNOWN 黄金书
斌 陈
(高能所)
梅 杨
文 康
(Accelerator Centor, IHEP)
-
10:00 AM
Machine protection, collimators optimiazation and dump systems
-
小昊 崔
(Accelerator Center)
-
10:50 AM
Injection and extraction system progress status (all components included, with position and dimensions)
-
Jinhui Chen
(Institute of High Energy Physics)
-
11:10 AM
CEPC control system design progress status, including control rooms locations and requirements
-
Dapeng JIN
(Institute of High Energy Physics, CAS, China)
-
11:30 AM
CEPC environment, health and safty issues for cepc proposal
-
Guangyi Tang
(IHEP)
忠剑 马
(高能所)