1. IE browser is NOT supported anymore. Please use Chrome, Firefox or Edge instead.
2. If you are a new user, please register to get an IHEP SSO account through https://login.ihep.ac.cn/registlight.jsp Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
4. The max file size allowed for upload is 100 Mb.
13–17 Oct 2014
IHEP
PRC timezone

Establishing Control Survey Network for Long Beamlines at Diamond Light Source

Not scheduled
Main Building (IHEP)

Main Building

IHEP

19B Yuquan Road, Shijingshan District,Beijing, 100049

Speaker

Mr William Hoffman (Diamond Light Source Ltd)

Description

The longest beamline(I13) at Diamond was completed in July 2010. At 250m from the Storage Ring establishing a survey control network proved challenging. A TDA5005 was used to measure the 3D network. Currently a second long beamline (I14) is being constructed. It is envisaged that we use the AT401 to measure and establish the network for I14. This paper will look at a simulation of the I13 network and the proposed adjacent I14 network to consider the feasibility of using the AT401

Primary author

Mr William Hoffman (Diamond Light Source Ltd)

Presentation materials

There are no materials yet.