13–17 Oct 2014
IHEP
PRC timezone

Alignment throughout the Update Engineering of Hefei Light Source

Not scheduled
Main Building (IHEP)

Main Building

IHEP

19B Yuquan Road, Shijingshan District,Beijing, 100049

Speaker

Prof. Xiaoye He (NSRL,USTC)

Description

The update engineering of Hefei Light Source is almost completed and the machine is being commissioned. This paper introduces the survey and alignment jobs that run throughout all the process of the engineering construction. They include establishing the control points of network for survey and alignment just after the building projects, surveying the first-level and second-level of control networkand date processing, pre-aligning all components and date processing, and aligning the components for it being accurately positioned during the machine installation. A complete process of accelerator alignment from beginning to end is described in this paper

Primary author

Prof. Xiaoye He (NSRL,USTC)

Co-author

Mr Wei Wang (Graduate student)

Presentation materials

There are no materials yet.