Speaker
Jun Guo
(S)
Description
ATLAS Phase-II upgrade will start approximately in 2023. Chinese cluster (USTC-SDU-SJTU) has been playing an important role in the Phase-II RPC production task. A laboratory for producing, testing and improving new type of RPC is constructed. The RPC to be adopted in the Phase-II upgrade is based on the 1mm gas gap of BIS7/8 upgrade. The simulation and measurement of this type of RPC have been performed. Prototypes have also been successfully built recently. Dedicated study on the key parameters of the prototypes is performed. The details will be shown in this talk.
Primary author
Jun Guo
(S)