Speaker
Dr
Hisham Sayed
(Brookhaven National Lab)
Description
The Neutrino Factory 4MW target system is optimized to increase the captured muon count that fits within the acceptance of the subsequent acceleration section. A proposed staged Neutrino Factory, producing lower muon intensities of 10^20 muons per year assumes a 1 MW target station. The proton driver of the scaled down target station has a lower intensity and lower energy (3 GeV) which could be upgraded to the full power of 4 MW. In this work we present an optimized capture mechanism for both the baseline 8 GeV proton beam target and the 3GeV proton beam target. The capture section and the following bunching channel design are optimized to adapt for both cases.