21–26 May 2017
Beijing International Convention Center
Asia/Shanghai timezone

Session

R2-Experimental detector systems(5)

25 May 2017, 14:00
Beijing International Convention Center

Beijing International Convention Center

No.8 Beichen Dong Road, Chaoyang District, Beijing P. R. China 100101

Conveners

R2-Experimental detector systems(5)

  • Wang Yi (Tsinghua University)
  • Jin Li (IHEP/THU)

Presentation materials

There are no materials yet.

  1. Dr Gabriel Miroslav (Max-Planck-Institute for Physics)
    25/05/2017, 14:00
    Experimental detector systems
    oral
    The SuperKEKB energy-asymmetric e+e- collider has now started commissioning and is working towards its design luminosity of 8x10^35cm-2s-1. In spring 2016, SuperKEKB circulated beams in both rings during the first phase of commissioning, with the Belle II detector at the roll-out position. A dedicated array of sensors collectively called BEAST II was installed around the SuperKEKB interaction...
    Go to contribution page
  2. Dr Hua Ye (DESY)
    25/05/2017, 14:18
    Experimental detector systems
    oral
    As an upgrade of asymmetric e+e- collider KEKB, SuperKEKB aims to increase the peaking luminosity by a factor of 40 to 8*10^{35}cm^{-2}s^{-1}. The SuperKEKB commissioning is achieved in 3 phases. The Phase 1 was successfully finished in June.2016. Now the commissioning is working towards the Phase 2 targeting to reach the luminosity of 1*10^{34}cm^{-2}s^{-1}. In Phase 2, the beam induced...
    Go to contribution page
  3. Murat Ali Guler
    25/05/2017, 14:36
    Experimental detector systems
    oral
    SHIP is a new general purpose fixed target facility, whose Technical Proposal has been recently reviewed by the CERN SPS Committee and by the CERN Research Board. The two boards recommended that the experiment proceeds further to a Comprehensive Design phase in the context of the new CERN Working group "Physics Beyond Colliders", aiming at presenting a CERN strategy for the European Strategy...
    Go to contribution page
Building timetable...