Speaker
            Mr
    Li Xu
            
                (Tsinghua University)
        
        
    Description
The LHCb Upgrade will replace the electronics of all subdetectors to cope with a hardware triggerless readout at 40 MHz. For the tracker system, the current T1-T3 stations will be fully replaced by the SciFi tracker system based on the scintillating fibre technology. The front-end read-out boards, which are connected to the SiPMs, are co-designed by the Tsinghua and Heidelberg groups. A quality assurance (QA) system is also designed to test the read-out board and the PACIFIC ASICs on the board. This talk will introduce the test flow and the test results of the ASICs and the boards.
            | Sessions (parallel only) | Detector performance and upgrade | 
|---|---|
| Type | Parallel talk | 
Primary author
        
            
                
                        Mr
                    
                
                    
                        Li Xu
                    
                
                
                        (Tsinghua University)
                    
            
        
    
        