1. IE browser is NOT supported anymore. Please use Chrome, Firefox or Edge instead.
2. If you are a new user, please register to get an IHEP SSO account through https://login.ihep.ac.cn/registlight.jsp Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
4. The max file size allowed for upload is 100 Mb.
10–15 Nov 2019
Guangzhou SYSU Kaifeng Hotel
Asia/Shanghai timezone

Operation of SSRF and Reliability based on the Feedback System

14 Nov 2019, 14:30
30m
Guangzhou SYSU Kaifeng Hotel

Guangzhou SYSU Kaifeng Hotel

oral Optimizing Availability Accelerator Systems

Speaker

Dr Qilong Sun (SSRF)

Description

SSRF is a 3rd generation 3.5 GeV light source. It became fully operational for users in 2009 and is presently celebrating its 10 years operation in 2019. From the former seven beamline, SSRF has fifteen beamlines and nineteen experiment stations in 2019. Ten Insert Devices (IDs) had been installed in the Shanghai Synchrotron Radiation Facility (SSRF) storage ring. The ID gaps were repeatedly adjusted for the scientific experiments during the user time. The residual quadrupole errors beyond the ID feedforward disturbed the beam optics, which include the betatron tune deviates that will spoil machine performance and brightness stability. To resolve the deterioration, a feedback system including SOFB, FOFB, ID Feedforward and Tune Feedback system has been developed and implemented in SSRF. The report will give a brief introduction of the operation of SSRF and the Feedback System using in the SSRF.

Primary author

Dr Qilong Sun (SSRF)

Co-authors

文志 张 (sinap) 旭 吴 (中国科学院上海高等研究院 上海光源大科学中心)

Presentation materials