1. IE browser is NOT supported anymore. Please use Chrome, Firefox or Edge instead.
2. If you are a new user, please register to get an IHEP SSO account through https://login.ihep.ac.cn/registlight.jsp Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
4. The max file size allowed for upload is 100 Mb.
10–15 Nov 2019
Guangzhou SYSU Kaifeng Hotel
Asia/Shanghai timezone

Reliability test of small power supplies in SuperKEKB Main Ring

12 Nov 2019, 10:30
1h 30m
Guangzhou SYSU Kaifeng Hotel

Guangzhou SYSU Kaifeng Hotel

Board: 40

Speaker

Shu Nakamura (KEK)

Description

SuperKEKB is an asymmetric-energy electron-positron collider for Belle II experiment to search new phenomena in B-meson decays. The MR magnet system consists of about 2,600 magnets, power supplies, and their interlock system. More than 400 magnets and power supplies were newly fabricated. The number of power supplies for the Main Ring (MR) magnets is 2393 as of June 2019. The most part of the power supplies are small class power supply which output power is less than 1 kW. Stability and setting accuracy of the power supplies are among the most critical factors for successful luminosity tuning. We construct a test-stand of the small-class power supplies to confirm its soundness. The MR magnet system ran stably without any serious problems during the Phase I and II commissioning runs, which contributed greatly to the smooth start-up of the MR.

Primary author

Presentation materials

There are no materials yet.