1. IE browser is NOT supported anymore. Please use Chrome, Firefox or Edge instead.
2. If you are a new user, please register to get an IHEP SSO account through https://login.ihep.ac.cn/registlight.jsp Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
4. The max file size allowed for upload is 100 Mb.
10–15 Nov 2019
Guangzhou SYSU Kaifeng Hotel
Asia/Shanghai timezone

The status and upgrade plan of CSNS

11 Nov 2019, 08:30
30m
Guangzhou SYSU Kaifeng Hotel

Guangzhou SYSU Kaifeng Hotel

Speaker

Prof. Sheng Wang (IHEP/CSNS)

Description

China Spallation Neutron Source (CSNS)) is a high intensity proton accelerator based facility for delivering spallation neutrons to users. It consists of an 80-MeV H- DTL linac, and a 1.6-GeV Rapid Cycling Synchrotron and a neutron production target. The accelerators will provide 100kW proton beam for neutron target. The construction began in 2011, and completed in 2018. From Aug. 2018, the facility was open to users. Now the facility is operation with beam power of 80kW. The introduction to the construction, beam commissioning and operation will be given, including the gradually increased beam power and availability. The plan for upgrading to 500kW will be also introduced in the presentation.

Primary author

Prof. Sheng Wang (IHEP/CSNS)

Presentation materials