1. If you are a new user, please register to get an Indico account through https://login.ihep.ac.cn/registIndico.jsp. Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
2. The name of any uploaded file should be in English or plus numbers, not containing any Chinese or special characters.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
10-15 November 2019
Guangzhou SYSU Kaifeng Hotel
Asia/Shanghai timezone
Home > Timetable > Session details > Contribution details

Contribution poster

Guangzhou SYSU Kaifeng Hotel -

The Improvement of CSNS Linac RF System Operation Stability

Speakers

  • MU ZHENCHENG

Primary authors

Co-authors

Content

The CSNS proton linear accelerator (Linac) delivers 81MeV proton beam to RCS ring. The Linac is comprised of H- ion source, RFQ, two Buncher cavities (MEBT), four DTL accelerators and one Debuncher cavity (LRBT).Three 25kW solid state amplifiers supply RF power to two Buncher cavities and one Debuncher cavity, repectively. The RFQ and four DTL accelerators are powered by five sets of klystron power sources. The fault rate of CSNS Linac RF system is correspondingly higher than other accelerator systems. The faults are mainly from five klystron power sources, including the klystron discharge, crowbar malfunction, etc. Some downtime is also from LLRF control system. This report will present the types of the faults and the improvement methods.