1. If you are a new user, please register to get an Indico account through https://login.ihep.ac.cn/registIndico.jsp. Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
2. The name of any uploaded file should be in English or plus numbers, not containing any Chinese or special characters.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
10-15 November 2019
Guangzhou SYSU Kaifeng Hotel
Asia/Shanghai timezone
Home > Timetable > Session details > Contribution details

Contribution poster

Guangzhou SYSU Kaifeng Hotel -

Measurement and correction of coupling with skew quads in BEPCII/BER

Speakers

  • JI HONGFEI

Primary authors

Co-authors

Content

We used only vertical correctors to correct the coupling in the positron ring (BPR) and the electron ring (BER) of BEPCII. However, in recent years, the experience in operation indicated remarkable differences in the corrections of coupling between BEPCII/BER and BEPCII/BPR. In this case, vertical correctors and skew quads were used to make correction of coupling in BEPCII/BER and control the vertical dispersion. Some simulations with SAD program have been performed, and the feasibility was demonstrated with the luminosity optimization in BEPCII.