Conveners
Performance Tracking & Panel Discussion
- Benjamin Todd (CERN)
Gregory Marr
(Brookhaven National Laboratory)
11/11/2019, 10:30
Fault Investigation
oral
This presentation briefly describes performance metrics and tracking methods for the Collider-Accelerator Department (C-AD) at Brookhaven National Laboratory (BNL),including the Relativistic Heavy Ion Collider (RHIC) and its historical performance statistics.
Mr
Rae Nicholas
(Australian Synchrotron)
11/11/2019, 10:40
oral
The Australian Synchrotron is a 3rd Generation Light Source located in Melbourne, Australia. It has been in User Operation since April 2007.
It consists of a 318m circumference 3GeV Electron Storage ring with a full energy injector and currently has 9 beamlines servicing more than 2000 users per year. Over the coming years this will increase to at least 14 beamlines with the BRIGHT upgrade...
Oksana Geithner
(GSI Helmholtz Centre for Heavy Ion Research)
11/11/2019, 10:50
oral
Due to the quite complex parallel operation, availability accounting at GSI has been always a tricky task. Since last year, a clear separate bookkeeping for the availability of each of our accelerators was introduced. Correspondent results for the FAIR Phase 0 physics run in 2019 will be presented. In order to increase the quality of the failure data, an Availability Working Group is about to...
Thomas MARION
(SYNCHROTRON SOLEIL)
11/11/2019, 11:00
oral
Synchrotron SOLEIL is the 3rd generation French synchrotron light source. It has been in operation since 2007 providing photon beams to 29 beamlines with a maximum intensity of 500 mA, 5000 hours a year.
We will present shortly our facility in terms of organization, key performance indicators. Management of the day-to-day operation will be discussed. The fault process management will be...
Mr
Weibin 刘渭滨
(高能所)
11/11/2019, 11:10
oral
For getting the higher experimental efficiency of BEPCII, top-up injection which can keep the higher luminosity as long as possible was studied. With the upgrades of some systems and the optimization of injection, top-up operation is feasible for colliding mode now. Preliminary top-up experiments show that the top-up operation can increase the integral luminosity about 20% than the...
Michael Bieler
(DESY)
11/11/2019, 11:20
oral
PETRA III, a third generation synchrotron light source at DESY, had for many years reached availabilities in the order of 95 %, while other light sources reached 98 to 99 %. In recent years, a lot of effort has been put into increasing PETRA's availability, and this year the availability might surpass 98 %. This paper will describe the efforts to increase the availability, and discuss the...