Conveners
Performance Tracking & Panel Discussion
- Benjamin Todd (CERN)
-
Gregory Marr (Brookhaven National Laboratory)11/11/2019, 10:30Fault InvestigationoralThis presentation briefly describes performance metrics and tracking methods for the Collider-Accelerator Department (C-AD) at Brookhaven National Laboratory (BNL),including the Relativistic Heavy Ion Collider (RHIC) and its historical performance statistics.Go to contribution page
-
Mr Rae Nicholas (Australian Synchrotron)11/11/2019, 10:40oralThe Australian Synchrotron is a 3rd Generation Light Source located in Melbourne, Australia. It has been in User Operation since April 2007. It consists of a 318m circumference 3GeV Electron Storage ring with a full energy injector and currently has 9 beamlines servicing more than 2000 users per year. Over the coming years this will increase to at least 14 beamlines with the BRIGHT upgrade...Go to contribution page
-
Oksana Geithner (GSI Helmholtz Centre for Heavy Ion Research)11/11/2019, 10:50oralDue to the quite complex parallel operation, availability accounting at GSI has been always a tricky task. Since last year, a clear separate bookkeeping for the availability of each of our accelerators was introduced. Correspondent results for the FAIR Phase 0 physics run in 2019 will be presented. In order to increase the quality of the failure data, an Availability Working Group is about to...Go to contribution page
-
Thomas MARION (SYNCHROTRON SOLEIL)11/11/2019, 11:00oralSynchrotron SOLEIL is the 3rd generation French synchrotron light source. It has been in operation since 2007 providing photon beams to 29 beamlines with a maximum intensity of 500 mA, 5000 hours a year. We will present shortly our facility in terms of organization, key performance indicators. Management of the day-to-day operation will be discussed. The fault process management will be...Go to contribution page
-
Mr Weibin 刘渭滨 (高能所)11/11/2019, 11:10oralFor getting the higher experimental efficiency of BEPCII, top-up injection which can keep the higher luminosity as long as possible was studied. With the upgrades of some systems and the optimization of injection, top-up operation is feasible for colliding mode now. Preliminary top-up experiments show that the top-up operation can increase the integral luminosity about 20% than the...Go to contribution page
-
Michael Bieler (DESY)11/11/2019, 11:20oralPETRA III, a third generation synchrotron light source at DESY, had for many years reached availabilities in the order of 95 %, while other light sources reached 98 to 99 %. In recent years, a lot of effort has been put into increasing PETRA's availability, and this year the availability might surpass 98 %. This paper will describe the efforts to increase the availability, and discuss the...Go to contribution page
-
Samuel Meyroneinc (Institut Curie)11/11/2019, 11:30
-
Benjamin Todd (CERN)11/11/2019, 11:40