1. If you are a new user, please register to get an Indico account through https://login.ihep.ac.cn/registIndico.jsp. Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
2. The name of any uploaded file should be in English or plus numbers, not containing any Chinese or special characters.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
21-26 May 2017
Beijing International Convention Center
Asia/Shanghai timezone
Home > Timetable > Contribution details

Contribution Poster

Trigger and data acquisition systems

Crate Distribution and Trigger Processing Module for the KOTO Experimen

Speakers

  • Mircea BOGDAN

Primary authors

Content

This paper introduces a new Crate Distribution and Trigger Processing Module (CDT) designed for the KOTO Experiment at J-PARC, Japan. The CDT Module will work in the existing KOTO-ADC crates. Each 6UVME Crate includes 16 ADC Modules which require an 8ns sampling clock and two trigger pulses. This new Module receives these signals from the System Master and distributes them to the ADCs via CAT6 Interconnects. In addition to this Fan-Out Function, the new CDT Modules collect high speed serial LVDS Data from the ADC modules, representing Cluster Bits from each ADC Channel. This new feature doesn’t require new ADC hardware and the Cluster Data are recorded via the same CAT6 cables that are used for Fan-Out. All local Cluster Bits from the KOTO CsI Crates are gathered into one place, a Decision Making CDT (DM-CDT), where a system Cluster Map is generated. Communication between the Crate CDT and the DM-CDT is done via optical Links at 2.5Gbps data rate. Cluster Numbers, calculated inside the DM-CDT, are sent to Master via a CAT6 cable. Currently in the KOTO Experiment, the Level-1 Trigger decision is made based on the Total Energy of the Calorimeter. The Cluster Numbers collected with the new CDT, will be used in combination to the Total Energy values for an enhanced Level-1 Trigger decision. The full design and final test results are presented.