1. If you are a new user, please register to get an Indico account through https://login.ihep.ac.cn/registIndico.jsp. Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
2. The name of any uploaded file should be in English or plus numbers, not containing any Chinese or special characters.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
21-26 May 2017
Beijing International Convention Center
Asia/Shanghai timezone
Home > Timetable > Session details
PDF | iCal

R3-Trigger and data acquisition systems(4)

Place

Location: Beijing International Convention Center
Address: No.8 Beichen Dong Road, Chaoyang District, Beijing P. R. China 100101
Date: 25 May 09:00 - 10:30 AM

Conveners

    • Zhang, Jinlong (A)
    • SPIWOKS, Ralf (CERN)

Timetable | Contribution List

Displaying 5 contributions out of 5
Type: oral Session: R3-Trigger and data acquisition systems(4)
Track: Trigger and data acquisition systems
This talk will be about an new version of high performance xTCA compliant and FPGA based Data Processing Unit for trigger and data acquisition applications like in PANDA, PXD/BelleII upgrade and CMS trigger. The Unit consists of 4 Advanced Mezzanine Cards (AMC, called xFP card), 1 AMC carrier ATCA board(ACAB) and 1 Rear Transition I/O Board(RTM). The ACAB board features 1 Xilinx Ultrascale XCKU060 ... More
Presented by Mr. Jingzhou ZHAO JINGZHOU on 25/5/2017 at 9:54
Type: oral Session: R3-Trigger and data acquisition systems(4)
Track: Trigger and data acquisition systems
India-based Neutrino Observatory (INO) has proposed construction of a 50kton magnetised Iron Calorimeter (ICAL) in an underground laboratory located in South India. Main aims of this, now funded project are to precisely study the atmospheric neutrino oscillation parameters and to determine the ordering of neutrino masses. The detector will deploy about 28,800 glass Resistive Plate Chambers (RPCs) ... More
Presented by Dr. Satyanarayana BHEESETTE on 25/5/2017 at 9:00
Type: oral Session: R3-Trigger and data acquisition systems(4)
Track: Trigger and data acquisition systems
After the Phase-I upgrade and onward, the Front-End Link eXchange (FELIX) system will be the interface between the data handling system and the detector front-end electronics and trigger electronics at the ATLAS experiment. FELIX will function as a router between custom serial links and a commodity switch network which will use standard technologies to communicate with data collecting and pro ... More
Presented by Jinlong ZHANG on 25/5/2017 at 10:12
Type: oral Session: R3-Trigger and data acquisition systems(4)
Track: Trigger and data acquisition systems
The ATLAS 'Phase-II' upgrade, scheduled to start in 2024, will significantly change the requirements under which the data-acquisition system operates. The input data rate, currently fixed around 150 GB/s, is anticipated to reach 5 TB/s. In order to deal with the challenging conditions, and exploit the capabilities of newer technologies, a number of architectural changes are under consideration. Of ... More
Presented by Santos ALEJANDRO on 25/5/2017 at 9:36
Type: oral Session: R3-Trigger and data acquisition systems(4)
Track: Trigger and data acquisition systems
The Level-1 (L1) Trigger system of the ATLAS experiment at CERN's Large Hadron Collider (LHC) plays a key role in the ATLAS detector data-taking. It is a hardware system that selects in real time events containing physics-motivated signatures. Selection is purely based on calorimetry energy depositions and hits in the muon chambers consistent with muon candidates. The L1 Trigger system has been up ... More
Presented by Louis HELARY on 25/5/2017 at 9:18
Building timetable...