Simulation and Physics Group Meeting

Asia/Shanghai

1. Simulation Tasks for Dual Readout + Wire Chamber Concept
a. For the first step, “Before Any Simulation”, two notes will prepared according to the Dual-readout and wire chamber.
b. For second level, “simulation: Hit level”, the hit map for drift chamber and dual readout need to be finished before end of July.
c. The code for wire chamber will be shared for all the people who are interested in.
We need to hold another meeting for dual readout.

2. Tracking and vertex optimization

3. Software
Need more people to work together

4. MC production
Now the sample are only for simulation level, it is better if some important processes can be processed to reconstruction level, for example, some important backgrounds for benchmark analysis.

5. Status Report on W mass measurement with CEPC in WW->lvqq final state
a. The plots on P4 need to be checked. Why it is not symmetrical in lower y axis and higher axis.
b. P6, please check the long tail in higher region. Maybe we can change the fit function.

6. A_FB Measurement in Z-Pole Run
Please check the code version and the distribution of photon pt and theta angle.

7. Photon Recovery

 

 

There are minutes attached to this event. Show them.