1. IE browser is NOT supported anymore. Please use Chrome, Firefox or Edge instead.
2. If you are a new user, please register to get an IHEP SSO account through https://login.ihep.ac.cn/registlight.jsp Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
4. The max file size allowed for upload is 100 Mb.
10–15 Nov 2019
Guangzhou SYSU Kaifeng Hotel
Asia/Shanghai timezone

Beam commissioning and operation reliability of the CSNS accelerator

12 Nov 2019, 09:30
30m
Guangzhou SYSU Kaifeng Hotel

Guangzhou SYSU Kaifeng Hotel

Speaker

Mr Yuliang Zhang (高能所)

Description

The China Spallation Neutron Source (CSNS) accelerator consists of an 80MeV H- linac, a 1.6GeV Rapid Cycling Synchrotron and two beam transport lines. The designed proton beam power is 100kW in Phase-I. CSNS project has been passed national acceptance in August 2018. From September 2018 to June 2019, CSNS successfully completed its first annual open run of user experiments and the beam power has been increased from 10kW to 50 kW step by step. In this presentation, the accelerator beam commissioning and operation reliability will be covered.

Primary author

Mr Yuliang Zhang (高能所)

Presentation materials