1. If you are a new user, please register to get an Indico account through https://login.ihep.ac.cn/registIndico.jsp. Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
2. The name of any uploaded file should be in English or plus numbers, not containing any Chinese or special characters.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
10-15 November 2019
Guangzhou SYSU Kaifeng Hotel
Asia/Shanghai timezone
Home > Timetable > Session details
PDF | iCal

Software Tools for Reliability

Place

Location: Guangzhou SYSU Kaifeng Hotel
Date: 14 Nov 15:30 - 5:00 PM

Conveners

    • Baggett, Ken (JLAB)

Timetable | Contribution List

Displaying 3 contributions out of 3
Type: oral Session: Software Tools for Reliability
The auxiliary tool of the Taiwan Photon Source (TPS) is developed to help operators improve the failure analysis ability to shorten the machine downtime. Presently, We have an operating alarm system to assist the accelerator operation, and a home-developed record-analysis tool for beam trip analysis. The part of alarm system, Alarm systems is developed by the use of the Control System Studio (CSS) ... More
Presented by Mr. Wei Yu LIN on 14/11/2019 at 16:00
Type: oral Session: Software Tools for Reliability
Periods of extended maintenance or failure often lead to systems being returned to Operations not behaving as they had. The changes can be subtle, but the consequences can be large. The Collider-Accelerator Department at Brookhaven National Laboratory has developed various tools to help identify unexpected changes in settings and in device behaviour. This poster outlines the different tools, ... More
Presented by Ian BLACKLER on 14/11/2019 at 15:30
Type: oral Session: Software Tools for Reliability
Operations group have developed and used a Microsoft Access based fault database since we started commissioning Diamond in 2006. Inconsistent update of responses and corrections sent be email or posted in the main log often results in information about the faults being lost, meaning a new more integrated approach was desired. In addition concerns with the lack of change history and granular contro ... More
Presented by Chris BAILEY on 14/11/2019 at 16:30
Building timetable...