1. If you are a new user, please register to get an Indico account through https://login.ihep.ac.cn/registIndico.jsp. Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
2. The name of any uploaded file should be in English or plus numbers, not containing any Chinese or special characters.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
10-15 November 2019
Guangzhou SYSU Kaifeng Hotel
Asia/Shanghai timezone
Home > Timetable > Session details > Contribution details

Contribution oral

Guangzhou SYSU Kaifeng Hotel -

Beam commissioning and operation reliability of the CSNS accelerator

Content

The China Spallation Neutron Source (CSNS) accelerator consists of an 80MeV H- linac, a 1.6GeV Rapid Cycling Synchrotron and two beam transport lines. The designed proton beam power is 100kW in Phase-I. CSNS project has been passed national acceptance in August 2018. From September 2018 to June 2019, CSNS successfully completed its first annual open run of user experiments and the beam power has been increased from 10kW to 50 kW step by step. In this presentation, the accelerator beam commissioning and operation reliability will be covered.