Speaker
            
    Eshraq Al-Dmour
            
                (Vacuum group coordinator)
        
        
    Description
The fact that the 3 GeV storage ring of MAX IV has a compact lattice and small aperture for the magnets makes the vacuum system a challenge in all stages, from design to installation and commissioning. The talk will cover the considerations for the vacuum system together with the layout. The design of the copper vacuum chambers, NEG coating and production issues are presented.
            Primary author
        
            
                
                
                    
                        Eshraq Al-Dmour
                    
                
                
                        (Vacuum group coordinator)