1. IE browser is NOT supported anymore. Please use Chrome, Firefox or Edge instead.
2. If you are a new user, please register to get an IHEP SSO account through https://login.ihep.ac.cn/registlight.jsp Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
4. The max file size allowed for upload is 100 Mb.
1–6 Nov 2026
Dongguan Exhibition International Hotel
Asia/Shanghai timezone

Retrofitting CSNS Utility Controls: Transition from Commercial SCADA to EPICS

3 Nov 2026, 15:10
5m
Dongguan Exhibition International Hotel

Dongguan Exhibition International Hotel

Speaker

绍兴 梁绍兴 (散裂中子源科学中心)

Description

This lightning talk introduces the migration project of the utility facility control system at the China Spallation Neutron Source (CSNS). CSNS auxiliary infrastructure including water cooling, compressed air, HVAC and power distribution originally adopted commercial SCADA software for control. Although commercial SCADA supports fast HMI development and mature industrial functions, it brings vendor lock-in, expensive licenses and closed interfaces. The growing number of subsystems makes unified management challenging.
To achieve a unified utility control system, CSNS initiated a phased migration from commercial SCADA to an EPICS distributed control system. We will present the existing commercial SCADA application status and phased replacement strategy, including PLC-EPICS IOC integration, data archiving, and Phoebus-based HMI reconstruction.
The migration proceeds with no interruption to equipment operation. Dual-system coexistence is maintained while O&M staff make the skill transition from commercial SCADA tools to the EPICS workflow.

Primary author

绍兴 梁绍兴 (散裂中子源科学中心)

Presentation materials