1. IE browser is NOT supported anymore. Please use Chrome, Firefox or Edge instead.
2. If you are a new user, please register to get an IHEP SSO account through https://login.ihep.ac.cn/registlight.jsp Any questions, please email us at helpdesk@ihep.ac.cn or call 88236855.
3. If you need to create a conference in the "Conferences, Workshops and Events" zone, please email us at helpdesk@ihep.ac.cn.
4. The max file size allowed for upload is 100 Mb.

Rehearsal of CEPC IDRC review

Asia/Shanghai
122 (多学科)

122

多学科

Description

加入 Zoom 会议
https://us02web.zoom.us/j/96790161440?pwd=ZTFzczNDVFpVdDNuRjVTaXEvOFRzdz09

会议号: 967 9016 1440
密码: 523011

MDI:

Yifang:

  • Firstly discuss the background estimate, this is the key points, then talk about the interaction region design.
  • Use pointers to indicate, ensuring that what you say corresponds to what is being shown.
  • Change the title to “beam background and MDI”

Manqi: The quantification of the background does not reflect in the results.

 

Tracker:

Yifang:

  • Put the result of COFFEE-2 chip.
    • Jianchun: already have many results, put 3-4 pages
  • Put more ITk strip testing result, balance with other options
  • Ignore internal details, like mechanics details
  • Need to have comparison between strip and pixel

Jianchun: put one page for DC LGAD

 

TPC:

Minghsui: P4 remove the table, only mention 3%

 

ECAL:

Manqi: Suggest to put performance results in previous pages

 

HCAL:

  • make sure simulation results shown in ECAL and HCAL talks using same calorimeter in simulation
  • prepare one backup slides to prove why HCAL is 6 lamda, which related to cost
  • prepare one backup slides to explain how 6% come from
  • Prepare slides for cost estimation

 

Muon:

Yifang:

  • reduce to 25 pages
  • Electronics design should be finalized before review

 

Magnet:

  • Jianchun: don’t list all chapters
  • Yifang: P14 muon detector assembly should be unified, no dead zone, but need to consider impact of leakage issue

 

Electronics:

Yifang:

  • remove P7
  • GBTx: indicate that we are willing to cooperate with CERN. If it’s not woked, we are also ready for developing by ourselves

 

TDAQ:

Yifang: too many options, suggests to remove full software option

 

Software:

Yifang:

  • should emphasis that our contribution is widely used by others
  • need a schedule table, indicating what is missing and when to be finsihed

 

Mechanics:

Yifang:

  • Create an animation of the installation sequence.
  • P8 add a table, summarize deformation of xyz direction

 

Performance:

Yifang:

  • Summary table missing new physics study: long-lived particle, missing momentum.
  • P20 double check number with Yang Zhang
  • P21 enlarge the table, remove column 2 and 3, add conclusion of physics improvement
  • ECAL change to <2%, then update numbers in the table in page 21

Qi Yan:

  • Suggest to introduce starting from detector indicator, then talk about physics indicators.