LCWS 2010
→
Asia/Shanghai
Description
The 2010 Linear Collider Workshop (LCWS10) and the International Linear Collider meeting (ILC2010) will be hosted by a consortium of Chinese Institutes: Institute of High Energy Physics, Tsinghua University, Beijing university, Institute of Theoretical Physics, University of Sciences and Technologies of China.
-
-
Opening Plenary
- 1
- 2
- 3
- 4
-
10:30
break
-
12:30
Lunch
-
GDE: Executive Committee (closed) ROOM 106
ROOM 106
-
RD (closed) ROOM 201
ROOM 201
-
15:40
break
-
GDE Plenary Main Hall
Main Hall
- 12
- 13
- 14
-
LCWS Plenary Main Hall
Main Hall
- 15
- 16
- 17
- 18
-
-
-
10:30
break
-
GDE: CFS: Joint with Main Linac Room 105
Room 105
-
26
CFS Tunnel Issues
-
27
Klystron Cluster Equipment
-
28
DRFS Equipment
-
29
General Installation Equipment
-
30
General Discussion
-
26
-
GDE: Sources Room 101
Room 101
-
LCWS: gamma gamma VIP room
VIP room
-
IDAG meeting (closed) Room 201
Room 201
-
GDE: Accelerator Physics / Beam Dynamics Room 104
Room 104
-
GDE: Executive Committee (closed) Room 106
Room 106
-
IDAG meeting (closed) Room 201
Room 201
-
12:30
Lunch
-
GDE: Beam Delivery System Room 103
Room 103
-
55
Joint with GG/ A high luminosity Photon collider without damping rings Valery Telnov (BINP)
-
56
The design of the cavity laser Brent Stuart (LLNL)
-
57
Status of the optical resonant cavity development Tohru Takahashi
-
58
Joint with CFS on IR hall
-
55
-
GDE: CFS: Joint with Main Linac
-
IDAG meeting (closed)
-
LCWS: gamma gamma: Joint with BDS and MDI See BDS for agenda Room 103
Room 103
-
GDE: Cost Mgmt Room 106
Room 106
-
GDE: Sources Room 101
Room 101
-
82
Polarized positron sources (Compton, ERL, Linac,โฆ)(1)
-
82
-
15:30
break
-
GDE: Accelerator Physics / Beam Dynamics: Joint with Main Linac (note room change) Room 202
Room 202
-
83
Join with ML (Room 202)
-
83
-
GDE: Beam Delivery System
-
84
Session devoted to double rep-rate at lower IP energy
-
85
Double rep rate impact on DR
-
86
Double rep rate impact on sources
-
87
Discussion
-
84
-
GDE: CFS: Joint with BDS (note room change)
-
88
Asian Sample Engineering Design
-
89
General CFS Discussion
-
88
-
GDE: Cost Mgmt
-
GDE: Damping Rings: DR Double Rep Rate Options (Joint with BDS)
-
GDE: Sources
-
97
General Discussion
-
97
-
IDAG meeting (closed)
-
LCWS: Calorimetry/Muon Bldg8 Rm5
Bldg8 Rm5
-
98
Status of Sensor and FE Electronics tests for FCAL
-
99
PDE at various wave lengths
-
100
RPCs and muon scintillators
-
101
Aging study for SiD Hcal and Muon System RPC
-
102
Calibration
-
98
-
LCWS: SUSY/NP
- 103
-
104
Probing two universal extra dimension model photons at the ILC
- 105
- 106
- 107
-
LCWS: Tracking/Vertex: Silicon tracking R&D Bldg8 Rm1
Bldg8 Rm1
- 112
- 113
- 114
- 115
- 116
-
LCWS: gamma gamma
-
-
GDE: Accelerator Physics / Beam Dynamics
-
117
Running 3TeV CLIC at lower energies Room 104
Room 104
-
118
Design of CLIC Spin Rotator
-
119
Drive beam and amplitude stabilization in CLIC
-
117
-
GDE: CFS Room 105
Room 105
-
125
BDS Tunnel Cross Sections Americas Region
-
126
Current Status of Central Region Technical Layout
-
127
Current Status of European Region Central layout
-
128
General Discussion
-
125
-
GDE: Damping Rings: R&D Status Room 102
Room 102
-
129
R&D status at LNF
-
130
R&D status at IHEP
-
131
R&D status at SLAC - e-cloud
-
132
R&D status at SLAC - Kickers Modulators
-
133
R&D Status at LBNL
-
129
-
GDE: Main Linac/SRF Room 202
Room 202
-
134
Summary of understanding of quench limit in 9-cell cavities using T-mapping and optical inspection
-
135
Latest 9-cell cavity testing results from FNAL
-
136
Recent cavity test results from KEK
-
137
New results on field emission suppression
-
138
Comparison EP procesing parameters at KEK and JLAB
-
139
IHEP high gradient efforts on 1.3GHz 9-cell cavity for ILC
-
140
Efforts on the R&D of SRF cavity at Peking University
-
141
Replica-method and local grinding repair
-
134
-
LCWS: Higgs/EWSB: session 2: Higgs couplings to gauge bosons Bldg8 Rm3
Bldg8 Rm3
-
146
Luminosity measurement at ILC with FCAL
- 147
- 148
- 149
-
146
-
LCWS: Machine Detector Interface Bldg8 Rm2
Bldg8 Rm2
-
150
Introductions
-
150
-
GDE: Sources Room 101
Room 101
-
155
Undulator based source
-
155
-
10:30
break
-
GDE: Accelerator Physics / Beam Dynamics Room 104
Room 104
-
156
Discussions: Review of present status and plans
-
156
-
GDE: Beam Delivery System: (note room change) Bldg8 Rm2
Bldg8 Rm2
-
157
BDS and MDI joint, SB2009 session
- 158
- 159
- 160
-
161
SB2009 topics discussion, SB2009 members
-
157
-
GDE: CFS Room 105
Room 105
-
162
Electrical/Mechanical Americas Region
-
163
Electrical/Mechanical Asian Region
-
164
General Discussion
-
162
-
GDE: Damping Rings: CesrTA Room 102
Room 102
-
165
CesrTA Overview
-
166
CesrTA EC Simulations Status
-
167
CesrTA LET Status and Plans
-
165
-
GDE: Main Linac/SRF Room 202
Room 202
-
168
Review of plans for upcoming cavity processing and testing
-
169
Review on ACD topics (new shape, large-grain cavity,vertical EP etc)
-
170
Update on global cavity database and yield evaluation
-
171
Status report of DESY activities
-
172
Discussion
-
168
-
GDE: Sources Room 101
Room 101
-
173
Undulator based soure
-
173
-
LCWS: Calorimetry/Muon Bldg8 Rm5
Bldg8 Rm5
- 174
- 175
- 176
- 177
-
LCWS: Higgs/EWSB: session 3, joint with gamma-gamma: More on Higgs couplings Bldg8 Rm3
Bldg8 Rm3
- 178
- 179
- 180
-
181
Higgs pair production in gamma gamma collier
-
LCWS: Machine Detector Interface Bldg8 Rm2
Bldg8 Rm2
-
182
SB2009 Discussions
-
183
SB2009 Discussions
-
182
-
LCWS: Tracking/Vertex: VXD R&D Bldg8 Rm1
Bldg8 Rm1
- 184
- 185
- 186
- 187
-
LCWS: gamma gamma: Joint with Higgs/EWSB See Higgs/ESWB for agenda Bldg8 Rm3
Bldg8 Rm3
-
GDE: Executive Committee (closed) Room 106
Room 106
-
RD (closed) Meeting Hall
Meeting Hall
-
12:30
lunch
-
GDE: Accelerator Physics / Beam Dynamics Room 104
Room 104
-
GDE: Beam Delivery System
-
188
Devoted to: ATF2 presentations
-
189
Shintake Monitor in ATF2: Present Status, Takashi Yamanaka, The University of Tokyo
-
190
Shintake Monitor in ATF2: Performance Evaluation, Youhei Yamaguchi, The University of Tokyo
-
191
ATF2 tuning updates and further plans -- Glen White
-
192
Other ATF2 contributions, details to follow
-
188
-
GDE: CFS Room 105
Room 105
-
193
Americas Region
-
194
Asian Region
-
195
General Discussion
-
193
-
GDE: CLIC/ILC General Issues Working Group Room 106
Room 106
-
GDE: Damping Rings: ECLOUD Working Group Room 102
Room 102
-
196
Introduction
-
197
E-Cloud Build-up
-
198
E-Cloud Build-up
-
199
E-Cloud R&D status at KEKB
-
196
-
GDE: EDMS Room 106
Room 106
-
GDE: Main Linac/SRF Room 202
Room 202
-
200
ILC Gradient R&D status and challenges
-
201
Gradient strategy proposal
-
202
Discussion
-
200
-
GDE: Sources Room 101
Room 101
-
203
Polarized positron sources (Compton, ERL, Linac,โฆ)(1)
-
203
-
LCWS: Higgs/EWSB: session 4, joint with SUSY/NP Bldg8 Rm3
Bldg8 Rm3
- 204
- 205
- 206
- 207
-
15:30
break
-
GDE: Accelerator Physics / Beam Dynamics Room 104
Room 104
-
219
Schedule is coming
-
220
Double rep rate at lower IP energy. Joint with HLRF and cryomodule/cryogenics experts.
-
219
-
GDE: Damping Rings: ECLOUD Working Group Room 102
Room 102
-
221
Kickers R&D at ATF
-
222
WG Summary
-
221
-
GDE: EDMS Room 106
Room 106
-
GDE: Main Linac/SRF Room 202
Room 202
-
223
Status of NML
-
224
Status of STF
-
225
R&D status in INFN Pisa
-
226
Discussion
-
227
Plug-compatibility document
-
223
-
GDE: Sources Room 101
Room 101
-
228
General Discussion
-
228
-
LCWS: Higgs/EWSB: session 5, joint with SUSY/NP Bldg8 Rm3
Bldg8 Rm3
- 229
- 230
- 231
- 232
-
GDE: CFS Room 105
Room 105
-
243
Finalization of Dubna Report
-
244
Status of JINR efforts
-
245
Americas Region
-
246
European Region
-
247
Asian Region
-
248
General Discussion
-
243
-
GDE: Beam Delivery System Room 103
Room 103
-
249
Schedule is coming
-
250
Double rep rate at lower IP energy. Joint with HLRF and cryomodule/cryogenics experts.
-
249
-
GDE: CLIC/ILC General Issues Working Group Room 106
Room 106
-
GDE: ILC Communications Room 106
Room 106
-
-
-
WWS (closed) Room 201
Room 201
-
GDE: Accelerator Physics / Beam Dynamics
-
251
Discussions: Review of present status and plans 2
-
251
-
GDE: Beam Delivery System: (note room change) Bldg8 Rm2
Bldg8 Rm2
-
252
BDS and MDI joint, Vibration and Stability session (& possibly IR hall with CFS)
- 253
- 254
- 255
-
252
-
GDE: CFS
-
256
Americas Region
-
257
European Region
-
258
Asian Region
-
259
CFS Resource Allocation and Planning Discussion
-
256
-
GDE: Damping Rings: TDPII Organization/Plans + Baseline Decision
-
260
Discussion (all)
-
260
-
GDE: Main Linac/SRF
-
261
S1-G Cryomodule assembly status
-
262
S1-G Cavity assembly status
-
263
S1-G RF preparation
-
261
-
GDE: Sources Room 101
Room 101
-
264
Polarized electron update in US
-
265
Polarized electron update in Japan
-
266
Low emittance e- source without damping ring
-
264
-
LCWS: Loop/top/QCD Bldg8 Rm3
Bldg8 Rm3
- 267
- 268
- 269
- 270
-
LCWS: Machine Detector Interface Bldg8 Rm2
Bldg8 Rm2
-
271
Vibration and Stability Studies
-
271
-
LCWS: Tracking/Vertex: Spare slot Bldg8 Rm1
Bldg8 Rm1
-
10:30
break
-
ATF,ATF2/ICB (closed)
-
GDE: Accelerator Physics / Beam Dynamics
-
GDE: Beam Delivery System
-
276
BDS and DR joint, ATF/ATF2 and ICB meeting
-
277
ATF/ATF2 international collaboration by March 2013 (by Junji Urakawa, 10 min. including 5 min. Q&A.)
-
278
ATF/ATF2 Report in JFY2009 (by Nobuhiro Terunuma, 20 min. including 5 min. Q&A.)
-
279
TB Report to ICB in JFY2009 (by Philip Burrows, 30 min. including 5 min. Q&A.)
-
280
ICB Closed Session (by Ewan Paterson, 60 min.)
-
276
-
GDE: CFS Room 105
Room 105
-
281
Americas Region
-
282
Asian Region
-
283
General Discussion
-
281
-
GDE: Damping Rings: ATF/ATF2/ICB (joint with BDS) Room 102
Room 102
-
GDE: Main Linac/SRF Room 202
Room 202
-
284
Proposal of experiment schedule of S1-G cryomodule
-
285
Cavity test plan
-
286
RF test plan
-
287
Cryomodule thermal test plan
-
284
-
GDE: Sources
-
288
Positron source for ILC using hybrid target
-
289
Hybrid target Test at KEK Linac
-
290
Positron source for CLIC using hybrid target
-
288
-
LCWS: Machine Detector Interface Bldg8 Rm2
Bldg8 Rm2
-
296
Status of Beamcal Readout Chip
- 297
- 298
- 299
- 300
-
296
-
LCWS: SUSY/NP Bldg8 Rm3
Bldg8 Rm3
-
301
Identification of new physics and general WIMP search at the ILC
- 302
-
303
Decaying dark matter in a left-right symmetric model
- 304
-
301
-
LCWS: Tracking/Vertex: joint session with SIM/REC Bldg8 Rm1
Bldg8 Rm1
- 305
- 306
- 307
- 308
- 309
-
GDE: Executive Committee (closed)
-
IDAG meeting (closed): Lunch Room 201
Room 201
-
12:30
Lunch
-
GDE: Accelerator Physics / Beam Dynamics Room 104
Room 104
-
310
Working Group Summaries
-
310
-
GDE: Beam Delivery System: (note room change) Bldg8 Rm2
Bldg8 Rm2
-
311
BDS and MDI joint
- 312
- 313
- 314
- 315
- 316
-
311
-
GDE: CFS Room 105
Room 105
-
317
CGD TDP II Planning and CFS Final Plenary Talk Preparation
-
317
-
GDE: Damping Rings: Damping Ring Collaboration Room 102
Room 102
-
318
LER Workshop/DR Collaboration
-
318
-
GDE: EDMS Room 106
Room 106
-
GDE: Main Linac/SRF Room 202
Room 202
-
319
FNAL industrialization study status
-
320
India industrialization study status
-
321
KEK industrialization study status
-
322
Status of XFEL module assembly facility at Saclay
-
323
For IPAC Industrialization session
-
319
-
GDE: Sources Room 101
Room 101
-
324
Positron source for CLIC using hybrid target
-
325
Liquid Pb target update
-
326
discussion
-
324
-
LCWS: Machine Detector Interface Bldg8 Rm2
Bldg8 Rm2
-
331
Joint with GDE Beam Delivery System
-
331
-
LCWS: Test Beam VIP room
VIP room
-
332
Fermilab Test Beam Facility
-
333
ETSB SLAC Test Beam Project
-
334
Asian Test Beam Facilities
-
335
AIDA Framework
-
336
Report on LCTW09 at Orsay
-
332
-
15:30
break
-
GDE Plenary
-
337
Group Discussion of TDP2 plans
-
338
Preparation for CERN / Geneva CLIC / ILC Workshop
-
337
-
GDE: EDMS Room 106
Room 106
-
GDE: EC/AAP Meeting
-
-
-
LCWS Plenary Bldg 1
Bldg 1
- 351
- 352
- 353
- 354
- 355
- 356
-
10:30
break