CEPC Physics and Detector Plenary Meeting

Asia/Shanghai
228 (IHEP Multi-subject Building)

228

IHEP Multi-subject Building

Description
Zoom Connection: https://weidijia.zoom.com.cn/j/69326273597?pwd=T0hCTW9zWlFZbDd3Nng4bzI1THlwQT09 ID:693 2627 3597 pwd:378821 The former version of the R&D documents were last discussed in detail at a meeting on April 29, 2020 which agenda is linked below. Those late Word files can be found in the "Document" tab below. Updates should be posted into today's indico agenda.

Attendance: Joao Guimaraes da Costa, Shengsen Sun, Gang Li, Shanzhen Chen, Zhaoru Zhang

Remotely connection: Feipeng Ning, Guang Zhao, Haoyu Shi, Huirong Qi, Hwidong Yoo, Mingyi Dong, Qun Ouyang, Tao Lin, Meng Wang, Wei Wei, Weidong Li, Weiguo Lu, Wenxing, Xiaolong Wang, Xin Shi, Yaquan Fang, Yong Liu, Yubo Han, Ying Zhang, Zhijun Liang, Zian Zhu, Linghui Wu, Yanyun Duan, Jing Dong, Franco Grancagnolo, Gabriella Gaudio, Hongbo Liao, Roberto Ferrari, Yubin Zhong,

 

1. Status of documents preparation

General: Every group shuold send a finalized version before next Monday, still posting the file to this indico page.

Vertex:

Zhijun and Ouyang will look into the current version and optimize it.

ECAL:

Joao will check with Jianbei about what modification was made.

HCAL:

Joao will check with Jianbei and Haijun about what modification was made.

Dual readout:

Roberto will check current version and send a new version around Monday

Muon:

Xiaolong will add manpower text and more contents in R&D.

Joao: put back-end readout description in seek for help

Magnet:

Zian updated contents for very thin solenoid design.

MDI:

Joao will contact Suen and Hongbo after meeting.

Software:

In current version, software group has changed text style, updated annual plan. They will add motivation of this project, and Muon detector software needs contents

Joao: make it clear in document about lack of manpower, and please put current text in offcial template to be unified with other groups.

 

2. Test results of TaichuPix chips by Ying Zhang

The time scale for engeneering run is April of this year. Before that, they need to finish several tests,  chip design and paper work for next submission.

 

There are minutes attached to this event. Show them.